Seat Rail Installation Started
Work has re-started on the CAC Boomerang, with the trial-fit installation of the seat-rails and seat rail cross-bar assembly. Using an original cross-bar to template from (which was destroyed by fire), Peter Goard did a superb job in engineering the unit that will fly in A46-73. Thank you again Peter for your sterling work.






